Universal Studios Update: Waterfront Open (PART 1)
It's another great morning here in Central Florida! To start the day in the best way possible (for theme park fans, that is), let's take a look at our latest Universal Studios Florida photo-report:
Let's start with some wait times:
It was a quiet day:
Very, very quiet:
The ads on the side of Shrek's show building are back:
Temporary midway games near the Hollywood Bowl Theater:
The Monsters Cafe' is now heavily featuring Nathan's Hot Dogs:
As we said, it was a very nice day:
As you definitely know, yesterday we took a great behind-the-scenes look at the Transformers - The Ride construction area (CLICK HERE to view our photo-gallery):
Along the waterfront, we noticed even more new laser projectors:
Minor work along the Hollywood waterfront:
Going toward the former Amity Harbor:
That building is becoming incredibly big:
Oh, and the new waterfront area is now open to the public (without theming details, of course):
Looking good:
From the other side:
New tables have been installed near Lombard's Seafood Grille:
Panoramic photo (FULL-SIZE):
Going toward the former Amity Harbor:
That building is becoming incredibly big:
Oh, and the new waterfront area is now open to the public (without theming details, of course):
Looking good:
From the other side:
New tables have been installed near Lombard's Seafood Grille:
Panoramic photo (FULL-SIZE):
Let's go trough the new pathway along the lagoon:
New themed lampposts are rumored to be installed on the columns in the future, but why didn't they leave a hole to insert the wires and everything else?:
More photos of the area:
Wacky Tourists:
The construction site was very active:
The former Amity bathrooms may be staying:
Work was done on the side shingles a few days ago. Of course, this may only be routine maintenace:
Another new laser box:
New themed lampposts are rumored to be installed on the columns in the future, but why didn't they leave a hole to insert the wires and everything else?:
More photos of the area:
Wacky Tourists:
The construction site was very active:
The former Amity bathrooms may be staying:
Work was done on the side shingles a few days ago. Of course, this may only be routine maintenace:
Another new laser box:
Post a Comment